Skip to content


“CHRONOLOGICAL FACT SHEET ON MARCH 2011 CRISIS AT FUKUSHIMA NUCLEAR POWER PLANT” by NUCLEAR INFORMATION AND RESOURCE SERVICE

“CHRONOLOGICAL FACT SHEET ON MARCH 2011 CRISIS AT FUKUSHIMA NUCLEAR POWER PLANT”

Posted in *English.

Tagged with .


One Response

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

  1. Maroc zik Mp3 says

    They continue to pump millions of gallons of water over the reactor cores and over the spent fuel rods in these various power plants. They have no way of capturing and holding this water that is contaminated and cleaning it before it is going to flow back into the ocean or seep down into the fresh water table there in Japan.



Some HTML is OK

or, reply to this post via trackback.