Skip to content


Repairs continue at the Palisades nuclear plant via Detroit Free Press

VAN BUREN COUNTY

Work continues at the Palisades nuclear plant, which shut down June 12 to repair a water tank leak, plant spokesman Mark Savage said Friday.

The tank contained 300,000 gallons of borated water, which is used to cool the reactor when nuclear fuel is replaced or to cool the core in an emergency.

No date has been set for the plant to reopen, Savage said.

Repairs continue at the Palisades nuclear plant

Posted in *English.

Tagged with , .


One Response

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

  1. chris says

    Thanks for sharing this article
    KOKO TV



Some HTML is OK

or, reply to this post via trackback.